Carlton Engineering provided structural engineering services for this 17,500 square foot gym, constructed of concrete masonry block and steel. The clear span structural steel roof system includes twin 112-foot shop fabricated and field spliced girder trusses. Carlton Engineering provided structural preliminary design, construction documents, bid support and construction administration.

 

 

  • CIVIL
  •  |  
  • SURVEY
  • GEOTECHNICAL
  •  |
  • STRUCTURAL
  •